Industrial electricity relief: what manufacturers need before 30 November

Manufacturers applying in the first round of the British Industrial Competitiveness Scheme (BICS) have until 11:59pm on 30 November 2026 to submit. The government updated its guidance on 13 November to clarify what to provide when electricity is supplied through a white-label arrangement. If the brand on your bill differs from the licensed supplier, check how the two are connected before you submit.

What the scheme covers

BICS exempts eligible grid electricity from certain policy costs. The guidance sets out relief from Renewables Obligation and Feed-in Tariffs costs from April 2027 and Capacity Market costs from October 2027. Use the official eligibility checker to assess your manufacturing activities and then use the applicant guidance to identify which electricity use you can include.

Build one meter schedule for the legal entity

The government allows one application per legal entity per year, covering multiple sites where appropriate. You cannot amend the application once it has been submitted. Start with a row for each supply and record:

  • Site and meter: the site address and MPAN from the electricity bill. Check that the MPAN on the supporting evidence matches the supply you intend to include.
  • Supplier: the name on the bill and, if a third party supplies under its own brand, the licensed supplier and the relationship between them. Ask for written confirmation if the contract and invoices leave this unclear.
  • Use and evidence period: the manufacturing activity, eligible and other uses at the site, and the dates covered by your bills and consumption evidence. Where a meter serves mixed uses, flag it and follow the guidance on evidence for those uses.
  • Site arrangements: identify who holds the supply contract and whether a landlord or another group entity receives the bill. Check what the evidence requirements say for each arrangement.

Ask finance, operations and whoever holds the supply contracts to review the same schedule before submission. For a multi-site manufacturer, that is a practical way to catch a missing meter or a supplier name that changed during the evidence period. See our guide to multi-site portfolio management for help organising site and meter records.

Sources: government guidance and change history, applicant guidance and Annex A evidence requirements.